Spanish Fort New Construction Inspection Timeline

If you are buying a new build in Spanish Fort, plan on a short series of independent inspections instead of one: a pre-drywall inspection while the walls are still open, a final inspection before you close, and a warranty inspection around month 11. Each one catches a different kind of problem at the moment it is cheapest to fix. Trinity Home Inspections performs these as new construction inspections for buyers across Baldwin and Mobile counties.
This guide lays out the timeline in plain language, shows one item that disappears behind drywall and one item worth checking at the final, and explains how to work with your builder so nothing is left to the last week before closing.
Why a New Home Still Needs Its Own Inspection
Many buyers assume a brand-new house has already been checked. Two checks do happen, but neither is built to protect you.
The first is the city’s. In Spanish Fort, the City Building Department reviews plans, issues permits, schedules inspections of building components and issues certificates of occupancy. The city has adopted the 2018 International Building Code and International Residential Code through Ordinance No. 541-2019. Those inspections confirm minimum code compliance. They are not a report written for you about workmanship or how well the house performs.
The second is the builder’s walkthrough. This is an orientation: a superintendent or customer care representative shows you how systems operate, where the shutoffs and panels are, and notes visible items on a punch list. A punch list is simply the list of unfinished or flawed items the builder agrees to fix. The walkthrough is run by the builder and is not the same as a systematic independent inspection, which is timed to construction milestones and focuses on condition and performance rather than finishes.
An independent inspection fills the gap. You hire the inspector, the report goes to you, and it includes photos you can hand to the builder.
How common are problems? A 2022 survey cited by Redfin found that nearly 9 in 10 new homes needed maintenance sooner than expected. The most frequently reported issues included HVAC problems, safety issues, finish problems, drainage issues, leaks or water damage and drafty doors or windows. None of that is a reason to worry about building new. It is a reason to look at the house with someone who does this every week.
The Buyer’s Timeline at a Glance
Stage | When it happens | What it is for |
Plan and book | Before or at the start of construction | Share the builder’s schedule so visits can be penciled in |
Pre-drywall inspection | After framing and rough-ins, before insulation and drywall | See wiring, plumbing, ducts and framing while exposed |
Final inspection | When the home is nearly finished, before the final walkthrough or closing | Test everything installed and confirm earlier items were fixed |
Builder walkthrough and punch list | Close to closing | Get remaining items in writing with dates |
11-month warranty inspection | Around months 10 to 11 after completion | Document issues while the builder warranty still applies |
Some guides also add a pre-pour foundation visit before the concrete is poured. That is a useful option if your schedule allows it, and the same principle applies: look before the thing gets covered. The three stages most Spanish Fort buyers use are the pre-drywall, the final and the warranty inspection.
Step 1: Book Early and Share the Builder’s Schedule
Redfin’s guidance is to book inspections early, ideally before construction starts, and to share the builder’s timeline so the inspector can pencil in tentative dates. Windows can be short. Once insulation goes in or the drywall crew arrives, the chance to see inside the walls is gone.
What to do:
Ask your builder or sales representative for the construction schedule in writing.
Ask how much notice they will give before framing and rough-in inspections are complete.
Confirm that your inspector is allowed on site and under what conditions, such as check-in with the superintendent.
Check your purchase contract for language about buyer access during construction. Many production builders limit site visits, so settle this before you sign if you can.
Where it goes wrong: buyers wait until the house is nearly done, and the exposed stage has already passed. You can still get a final inspection, but you lose the chance to see what is behind the walls.
Step 2: The Pre-Drywall Inspection
A pre-drywall inspection happens after framing and the electrical, plumbing and HVAC rough-ins are done, but before insulation and drywall close the cavities. One guide calls it the most critical phase because so much is visible at once. At Trinity, pre-drywall inspections are one of the services we offer for new builds, and we use thermal imaging at no extra cost.
What an inspector looks at in this stage:
Framing and structural connections
Electrical wiring and boxes
Plumbing supply and drain runs
HVAC ductwork
Moisture barrier and weather detailing
Insulation, if it has been installed
One Item That Becomes Concealed: Ductwork and Wiring in the Wall Cavities
Pick any item and it makes the same point, but ductwork is a good example. Duct runs travel through attics, soffits and walls. If a duct is crimped or disconnected, the room it serves runs hot or cold, and you may spend years blaming the thermostat. Once the ceilings and walls are closed, nobody sees the problem again unless they open the drywall. The same goes for electrical connections inside the walls and for plumbing slopes on drain lines.

At this stage, a fix is a matter of a crew coming back for a few hours. After drywall, it is a repair job with patching and repainting, and the conversation with the builder gets harder. Our own what builders commonly miss before drywall goes up article goes deeper on specifics.
What Happens Next
Your report goes to you. Send the relevant items and photos to the builder in writing, ask for a date they will be corrected, and ask that the inspector be allowed to confirm the fix before insulation and drywall go in. Keeping this in writing matters, because verbal promises tend to fade by the time of closing.
Step 3: Understand the City’s Part Without Relying on It
The city’s inspections run in parallel with your own. In Spanish Fort’s ordinance, the contractor is responsible for calling in required inspections, and the Building Department may inspect for compliance at other times too. You do not schedule those. But you can ask your builder which city inspections have passed and when, and ask to see the final approval before closing.
The city’s permitting rules also apply earlier than most buyers expect: the Building Department notes that a building permit is not issued for sites disturbing 1,000 square feet or more without an approved Land Disturbance Permit. That matters mostly if you are buying a lot and building, because grading and erosion control are the builder’s responsibility and show up later as drainage questions.
The practical point: a passed municipal inspection and a private phase inspection are not substitutes for each other. The city confirms code minimums. Your inspector reports on workmanship and function for you.
One more Alabama detail. Home inspectors in the state must meet licensing requirements, including education, testing and liability insurance. The state also offers a “Residential New Construction” designation for licensed inspectors who complete an 8-hour training module, though the code says the designation is not mandatory for inspecting new construction. Ask any inspector you are considering for their Alabama license and their experience with new builds.
Step 4: The Final Inspection
The final inspection happens when the house is substantially complete, before your final walkthrough or closing. This is the one most buyers think of. The inspector evaluates installed systems under normal operating conditions, windows and doors, grading and drainage around the outside, and whether items flagged earlier were corrected.
A general inspection looks at the roof, exterior, foundation, structure, heating and cooling, plumbing, electrical, attic insulation and ventilation, and doors, windows and interior. InterNACHI’s standards describe it as a non-invasive, visual examination of the accessible areas. In Alabama, state standards of practice also require inspectors to report on significantly deficient systems and recommend corrections.
One Item to Check at Final: Grading and Drainage Around the House
If you do only one thing yourself at the final, walk the outside of the house and look at where the ground meets the foundation. Soil should slope away from the walls, not toward them. Look for low spots, bare dirt that has already washed out, and downspouts that dump water against the foundation.
This matters on the Gulf Coast, where heavy summer rain is routine and flat lots hold water. Drainage problems appear on Redfin’s list of common new-construction findings, and they are easy for a builder to correct before closing, while landscaping and sod are still fresh. Sod and final grading are often the last things finished, so check early in the day or after a rain to see where water actually goes.
What Else a Final Inspection Can Catch
Outlets that do not work
Missing insulation
Small leaks under sinks
Drafty doors and windows
HVAC performance problems
Roof flashing or exterior sealing issues
We also use drones for roof views where access is limited, and moisture meters to verify suspected damp areas.
Step 5: Coordinate With the Builder Before Closing
This is where many buyers lose leverage. Once you have the report, the order of events matters.
Send the report promptly. Share the items you want addressed, with photos, as soon as you have the report. Most builders have a process for correction requests.
Keep the tone cooperative. Good builders want the house to be right. Frame it as a list to resolve, not a dispute.
Separate safety and function from cosmetics. Ask for the items that affect safety, water, structure and systems first. Cosmetic items can go on the builder’s own punch list.
Ask for dates. An item with no completion date tends not to get done.
Plan a re-check. Ask your inspector whether a short follow-up visit makes sense for the major items.
Decide how to handle anything unfinished at closing.
On that last point, Nolo’s legal encyclopedia describes the options for defects in a newly built house: delay the closing, close but have the developer set aside money in a trust account for repairs, or make a punch list with a completion date for each task and have the developer sign it before you agree to close. Which option fits depends on your contract and your lender’s timeline, so talk it through with your real estate agent and, for contract language, a real estate attorney.
If you are working with a real estate agent, share the timeline with them early. They can build inspection dates into the contract and keep closing dates realistic.
Step 6: The 11-Month Warranty Inspection
Most builders warrant their work for one year, though terms vary, so read yours. An inspection timed around month 11 documents problems while the warranty still covers them. Guides commonly recommend an inspection 10 to 11 months after completion, leaving time to submit claims before coverage ends.
A house changes in its first year. Lumber dries and shifts, the slab settles, caulk shrinks, and systems that were only tested briefly at final run through a full range of seasons. Gulf Coast humidity also puts roofs, attics and air conditioning through a lot of work. Items that commonly turn up:
Hairline cracks or gaps at trim and corners
Doors and windows that have shifted
Moisture signs in the attic or around plumbing fixtures
HVAC airflow or drainage concerns
Drainage changes after the first rainy season
Our 11-month warranty inspection is built for this. For preparation, see our guides on what to check before it expires and our 11-month builder warranty checklist for the Spanish Fort and Daphne area.
What’s Included in a New Construction Inspection With Trinity
Scope depends on the stage, but across our inspections you can expect:
A visual inspection by an InterNACHI-certified inspector of the accessible areas of the home
Review of systems such as electrical, plumbing, HVAC, roof, structure, and attic
Thermal imaging at no extra cost, to help identify insulation gaps, potential moisture issues and overheated electrical components
Moisture meters, a carbon monoxide detector and a combustible gas leak detector where needed
Drone views of the roof when access is unsafe or limited
A photo and video report, delivered the same day in 99% of cases
Add-ons such as sewer scope inspections, mold testing, air quality testing, pool checks and well or grinder pump inspections are available when your property calls for them. Learn more about our sewer scope inspections if your new home connects to a municipal line.
Our Perspective
We are a family-owned, locally owned company, and we treat a new build the way we would want our own family’s home treated. New homes are the ones people most often skip inspecting, because everything looks clean and the builder is friendly. Clean paint tells you very little about what is behind it. The way we see it, the pre-drywall visit is where a new-construction inspection earns its value. That is the one chance to look at wiring, plumbing, ducts and framing with nothing covering them, and thermal imaging helps us look for insulation gaps and moisture concerns once it is installed. The final inspection then confirms that what was flagged got fixed. The 11-month inspection closes the loop while your builder warranty is still in force. Our approach is straightforward answers, clear communication and a report that tells you what it finds. You should be able to hand the photos to your builder and have an easy, specific conversation. Matt
Booking Your Inspections in Spanish Fort
If you are building or buying new in Spanish Fort, the simplest path is to put all three visits on the calendar early. Trinity’s InterNACHI-certified inspectors cover Baldwin and Mobile counties, and our Spanish Fort home inspection page has local details. You can start with our new construction home inspections page.
[

InterNACHI members are backed by the organization’s Honor Guarantee up to $25,000, and our team completes ongoing education every year. That is the training behind a report you can take to your builder.
Frequently Asked Questions
Does a new home need an inspection if the city already approved it?
Yes. The city’s inspections confirm that the work meets minimum code requirements, and the Building Department issues the certificate of occupancy. They do not give you a report about workmanship, performance or unfinished items. A private inspection is written for you and includes photos you can give the builder.
When should I schedule a pre-drywall inspection?
Book it as early as you can, ideally before construction begins, and share the builder’s schedule with your inspector. The visit should happen after framing and the electrical, plumbing and HVAC rough-ins are done but before insulation and drywall go up. Once the cavities are closed, you lose the chance to see inside.
What if the final inspection finds problems right before closing?
Send the report to your builder in writing right away. You can ask to delay closing, to have funds held in trust for repairs, or to get a punch list with completion dates signed before you close. Talk it over with your agent, and with an attorney for contract questions.
Is the 11-month inspection worth it if the house seems fine?
It is timed to give you a documented list while the builder warranty still applies. Many issues, like small leaks, shifting doors or airflow concerns, are not obvious day to day. Having them in a report before month 12 gives you a clear basis to submit warranty requests.
Do I need a special license for a new construction inspector?
Alabama requires home inspectors to be licensed. The state also has an optional Residential New Construction designation, but its code says the designation is not mandatory for inspecting new construction. Ask about the inspector’s license and their new-build experience.
Ready to schedule? Call 251-210-7376 or visit TrinityInspectionsLLC.com.
Sources
Recommended
